Support

Harborough Local Plan 2011-2031, Proposed Submission

Representation ID: 6008

Received: 01/11/2017

Respondent: Mr Gary Shepherd

Representation Summary:

I have already commented on the number of houses that have already been built and are proposed. With an existing additional 700 houses that have already been built i would ask why a primary school has not already been built. Surely the area has needed a school for sometime and should not be built only when an additional 300 houses have been completed.

Full text:

I have already commented on the number of houses that have already been built and are proposed. With an existing additional 700 houses that have already been built i would ask why a primary school has not already been built. Surely the area has needed a school for sometime and should not be built only when an additional 300 houses have been completed.