Object

Regulation 19 - Proposed Draft Local Plan Submission

BA1

Representation ID: 13723

Received: 17/04/2025

Respondent: National Grid Electricity Transmission

Agent: National Grid Electricity Transmission

Legally compliant? Not specified

Sound? Not specified

Duty to co-operate? Not specified

Representation Summary:

Without appropriate acknowledgement of the NGET assets present within the site (BA1), the policy should not be considered effective as it cannot be delivered as proposed; unencumbered by the constraints posed by the presence of NGET infrastructure. We propose modifications to the referenced site allocation BA1 as set out in 'Change to plan'.
Re: New Infrastructure - The Council should be cognisant of the need to increase the capability of the electricity transmission system between the North and the Midlands, and between the Midlands and the South. It is also needed to facilitate the connection of proposed new offshore wind, and subsea connections between England and Scotland, and between the UK and other countries across the North Sea.

Support

Regulation 19 - Proposed Draft Local Plan Submission

Policy SA01: Site Allocations

Representation ID: 14046

Received: 17/04/2025

Respondent: National Grid Electricity Transmission

Agent: National Grid Electricity Transmission

Representation Summary:

Addendum comment: In terms of the reconductoring works comprising replacement of existing conductors and associated fittings, possibly strengthening of pylon steelwork and potential limited tower replacement if the requirement is identified by proposed condition surveys, no site allocations in the Draft Local Plan are in close proximity to this overhead line route and therefore no impacts are expected.