Sustainability Appraisal - Second Interim SA Report Appraising Options for the Provision of Strategic Distribution Growth (Feb 2016)

Search Representations

Results for Environment Agency search

New search New search

Comment

Sustainability Appraisal - Second Interim SA Report Appraising Options for the Provision of Strategic Distribution Growth (Feb 2016)

Q1. Do you have any comments to make on the Second Interim Sustainability Appraisal Report - Appraising Options for Strategic Distribution growth (Feb 2016)?

Representation ID: 5328

Received: 16/03/2016

Respondent: Environment Agency

Representation Summary:

In line with the National Planning Policy Framework, all new development should be steered away from areas of flood risk. We have submitted our formal comments to the planning applications associated with Option A, B and C and we have no further comment to make at this stage.

Comment

Sustainability Appraisal - Second Interim SA Report Appraising Options for the Provision of Strategic Distribution Growth (Feb 2016)

Strategic Distribution Option A

Representation ID: 5329

Received: 16/03/2016

Respondent: Environment Agency

Representation Summary:

The existing on-site seweage treatment plant would likely need to make provision for extra flow generated by the development of the site.

Comment

Sustainability Appraisal - Second Interim SA Report Appraising Options for the Provision of Strategic Distribution Growth (Feb 2016)

Q1. Do you have any comments to make on the Second Interim Sustainability Appraisal Report - Appraising Options for Strategic Distribution growth (Feb 2016)?

Representation ID: 5330

Received: 16/03/2016

Respondent: Environment Agency

Representation Summary:

In line with the National Planning Policy Framework, all new development should be steered away from areas of flood risk.
We have submitted our formal comments to the planning applications associated with Option A, B and C (summarised as separate representations) and we have no further comment to make at this stage.

Comment

Sustainability Appraisal - Second Interim SA Report Appraising Options for the Provision of Strategic Distribution Growth (Feb 2016)

Strategic Distribution Option A

Representation ID: 5331

Received: 16/03/2016

Respondent: Environment Agency

Representation Summary:

Foul sewerage generated by development will need to be accommodated, if via the existing on-site sewerage treatment plant then provision for the extra flow may be required. An application will need to be made under the Environmental Permitting Regulations to increase the flow discharging to the watercourse.

Comment

Sustainability Appraisal - Second Interim SA Report Appraising Options for the Provision of Strategic Distribution Growth (Feb 2016)

Strategic Distribution Option B

Representation ID: 5332

Received: 16/03/2016

Respondent: Environment Agency

Representation Summary:

According to Environment Agency maps land in the south-eastern corner (Option B site) lies within Flood Zone 3. The extent of Flood Zone is limited to the channel of the watercourse at that location, where development is unlikely. Notwithstanding this the LPA should be satisfied that the site is sequentially preferable from a flooding perspective.
No in-principle objection to the development (of Option A), subject to appropriate mitigation measures. However, preferred option for any detailed proposal would be for the watercourse to be retained to convey only existing fluvial flows and that a separate surface water drainage SuDs system is provided to manage surface water run-off from the site. Guidance is provided to ensure no increase in flood risk, or deterioration of the existing waterbody as a result of development and to improve and protect water quality, habitat and amenity.
Development that encroaches on the Padge Hall Brook has a potentially severe impact on ecological value. Opportunities to incorporate biodiversity in and around developments should be encouraged.

Comment

Sustainability Appraisal - Second Interim SA Report Appraising Options for the Provision of Strategic Distribution Growth (Feb 2016)

Strategic Distribution Option C

Representation ID: 5333

Received: 16/03/2016

Respondent: Environment Agency

Representation Summary:

According to Environment Agency maps there is an area of land through the site (Option C) which lies within Flood Zones 2 and 3. The LPA should be satisfied that the site is sequentially preferable from a flooding perspective.
To meet the NPPF no development or ground raising on any area that is designated as Flood Zone 2or 3 should be permitted. Appropriate mitigation measures are required to; protect the underlying Secondary A aquifer, and protect the water environment. Additional foul sewage capacity and / or a new private sewage treatment facility required.