Harborough Local Plan 2011-2031, Proposed Submission

Representation ID: 7325

Received: 31/10/2017

Respondent: Severn Trent Water

Representation Summary:

Foul flows from the development will join a 225 mm dia pipe at the back of properties on Main St. Surface water from the development will drain to the local watercourse. There is one pollution recorded at the watercourse D/S from the development. There is one flooding incident further D/S.
Potential impact on the sewerage infrastructure: LOW

Full text:

See letter and Excel files attached for detail.

Object

Harborough Local Plan 2011-2031, Proposed Submission

Representation ID: 7431

Received: 16/11/2017

Respondent: Gladman Developments

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Gladman object to Criterion (f) of Policy F1 as it precludes the provision of large retention ponds on site to deal with surface water drainage. There is no definition in the Policy as to what the Council would consider to be 'large' and therefore the clause is ambiguous and difficult to implement. In addition, as the drainage strategy for the site is still being worked up, there is no indication as yet as to what the most appropriate drainage strategy is. There is no reasoning included within the supporting text to Policy F1 as to why a large retention pond would not be
appropriate.

Full text:

Refer to attached document.