My observation is a general one, although I give a specific example. The observation is that building on flood plains is NOT being avoided. The latest example is the warehousing nearing completion on the field at the north-east of the J20 roundabout on M1. In the 31 years that I have lived in Lutterworth I have seen this field, hitherto farmland, flooded by the River Swift on a number of occasions.

Full text:

My observation is a general one, although I give a specific example. The observation is that building on flood plains is NOT being avoided. The latest example is the warehousing nearing completion on the field at the north-east of the J20 roundabout on M1. In the 31 years that I have lived in Lutterworth I have seen this field, hitherto farmland, flooded by the River Swift on a number of occasions.

Object

Harborough Local Plan 2011-2031, Proposed Submission

Representation ID: 7011

Received: 17/11/2017

Respondent: Mr Simon Smith

Legally compliant? No

Sound? No

Duty to co-operate? No

Representation Summary:

Flooding at Ullesthorpe Leicestershire has not been outlined in the Local Plan. The watercourse, a tributary of the Soar, drains the majority of the current Magna Park and, from my experience, floods more often onto surrounding property. Any further development of the distribution centre must address these issues.

Full text:

Flooding at Ullesthorpe Leicestershire has not been outlined into the Local plan the watercourse a tributary of the saw Drains the majority of the current magna park and from my experience flood more often onto surrounding property, any further development of the distribution centre must address these issues.