Representation Summary:

This is the best of the worse by not expanding Magna Park but contribution to employment with a minimum impact on traffic through villages

Comment

Sustainability Appraisal - Second Interim SA Report Appraising Options for the Provision of Strategic Distribution Growth (Feb 2016)

Representation ID: 5104

Received: 03/03/2016

Respondent: BROUGHTON ASTLEY Parish Council

Representation Summary:

Broughton Astley Parish Council would not like to amend any previous comments, subject to ratification by the Parish Council, at the meeting to be held on Thursday 17 March 2016.

Comment

Sustainability Appraisal - Second Interim SA Report Appraising Options for the Provision of Strategic Distribution Growth (Feb 2016)

Representation ID: 5126

Received: 07/03/2016

Respondent: Mr Gerard Williams

Representation Summary:

With option A already having obtained planning permission for 37 hectares additional development would provide over supply of warehousing for the region. This will cause a concentration of warehousing where it is not needed, not wanted by local residents and does not fulfill central governments policy of having such developments on a rail hub. The employment opportunities generated will better suit development in an area with unemployment to meet that labour need.
I strongly urge the planning committee to reject this development and protect our community and environment from the further advance of this superfluous facility.

Comment

Sustainability Appraisal - Second Interim SA Report Appraising Options for the Provision of Strategic Distribution Growth (Feb 2016)

Representation ID: 5129

Received: 07/03/2016

Respondent: mrs vera mcbay

Representation Summary:

No account account taken of huge traffic loads on country village roads, lay byes already full with parked up lorries and the litter they leave behind

Comment

Sustainability Appraisal - Second Interim SA Report Appraising Options for the Provision of Strategic Distribution Growth (Feb 2016)

Representation ID: 5137

Received: 09/03/2016

Respondent: LUTTERWORTH TOWN COUNCIL Parish Council

Representation Summary:

Lutterworth Town Council wishes to repeat its previous objections in relation to these options that do not appear to have been addressed to date.

Comment

Sustainability Appraisal - Second Interim SA Report Appraising Options for the Provision of Strategic Distribution Growth (Feb 2016)

Representation ID: 5152

Received: 13/03/2016

Respondent: Mrs Kathleen Rowell

Representation Summary:

As Option A has been given permission, if this is given permission it will create jobs that are not needed in this area which in turn will bring huge amounts of extra traffic, air and light pollution. The number of HGV's and inherent problems will become much greater and add to the misery of local people who do not want this
Expansion. The identified need is and can be met elsewhere in the region, East Midlands gateway, Ibstock, Rugby gateway as well as further afield

Comment

Sustainability Appraisal - Second Interim SA Report Appraising Options for the Provision of Strategic Distribution Growth (Feb 2016)

Representation ID: 5161

Received: 13/03/2016

Respondent: Ian Lewis

Representation Summary:

A + B would provide in excess of the 107 hectares needed by 18 hectares. It will create a need for labour that does not exist within the area, bringing huge problems with traffic, road safety, pollution etc as well as causing problems for existing employers recruiting in the local labour market. Additionally, there have been planning applications approved at East Midlands Gateway, Ibstock, Rugby Gateway, which will more than fulfill the need for the additional hectares.

Comment

Sustainability Appraisal - Second Interim SA Report Appraising Options for the Provision of Strategic Distribution Growth (Feb 2016)

Representation ID: 5186

Received: 14/03/2016

Respondent: Mrs Shiela Carlton

Representation Summary:

No

Comment

Sustainability Appraisal - Second Interim SA Report Appraising Options for the Provision of Strategic Distribution Growth (Feb 2016)

Representation ID: 5211

Received: 15/03/2016

Respondent: Miss Alison Bent

Representation Summary:

If Option A goes ahead then A + B would provide in excess of the 107 hectares needed by 18 hectares. It will create a need for labour that does not exist within the area, bringing huge problems with traffic, road safety, pollution etc as well as causing problems for existing employers recruiting in the local labour market. Additionally, there have been planning applications approved at East Midlands Gateway, Ibstock, Rugby Gateway, which will more than fulfill the need for the additional hectares.

Comment

Sustainability Appraisal - Second Interim SA Report Appraising Options for the Provision of Strategic Distribution Growth (Feb 2016)

Representation ID: 5213

Received: 15/03/2016

Respondent: Suzanne Hayto

Representation Summary:

If this option goes ahead, together with option A, it will provide more hectares of land than is required in Leicestershire. This area does not need the employment, more traffic congestion, additional pollution etc etc, We are at capacity already! The warehousing should be put where jobs are actually needed.

Comment

Sustainability Appraisal - Second Interim SA Report Appraising Options for the Provision of Strategic Distribution Growth (Feb 2016)

Representation ID: 5230

Received: 15/03/2016

Respondent: Ashby Parva Parish Meeting

Representation Summary:

In providing 34% of the suggested 107 ha. of land for warehousing, by approving 15/0091, Harborough provides more than its share. The 107 ha. don't all have to be in the Magna Park area. Since 'option' A is now a fait accompli, option B would, by adding 88.65 ha. to the 37 approved bring the total to over 125 ha., substantially exceeding the county-wide target.

Option B forcasts almost 3500 employees. Option A forecast around 1200. Harborough does not need anything remotely near that number of jobs, which should be located where there need is

Comment

Sustainability Appraisal - Second Interim SA Report Appraising Options for the Provision of Strategic Distribution Growth (Feb 2016)

Representation ID: 5241

Received: 16/03/2016

Respondent: Mr Brian Fowler

Representation Summary:

I would draw attention to the fact that Option A added to Option B would exceed the earlier stated application of 107 hectares and would thus be a further vacuum in labour which would draw even more traffic to the area on overfull roads.

Comment

Sustainability Appraisal - Second Interim SA Report Appraising Options for the Provision of Strategic Distribution Growth (Feb 2016)

Representation ID: 5252

Received: 16/03/2016

Respondent: Mr Graham Logan

Representation Summary:

As Option A has already been approved by HDC despite over 900 written objections.
Any further expansion would exceed the county's quota of 107 hectares and contravene the council's latest (approved) Local Plan.
Building 23 metre high warehouses on farmland is definitely not wanted by those living near Magna Park.
Please do not disregard our views.
Why not build new warehouses nearer to those who would value the new jobs?
Magna Park has no railhead so building warehouses here does not fulfil national government's policy.
These plans would generate >£15M a year in business rates - is it all about the money?

Comment

Sustainability Appraisal - Second Interim SA Report Appraising Options for the Provision of Strategic Distribution Growth (Feb 2016)

Representation ID: 5255

Received: 16/03/2016

Respondent: Mr Graham Logan

Representation Summary:

Now that Option has been approved, any approval of either Option B or C would mean exceeding Leicestershire quota of 107 hectares of warehousing as well as a further contravention of the existing approved Local Plan.
Until a new Local Plan has been officially approved the existing one should be used in determining these three Magna Park applications.
Our roads do not cope at present with all the traffic and approving this Option would substantially increase HGVs and commuter cars, meaning more congestion, RTAs and pollution.
I strongly urge HDC to reject this Option and respect the views of those living here.

Comment

Sustainability Appraisal - Second Interim SA Report Appraising Options for the Provision of Strategic Distribution Growth (Feb 2016)

Representation ID: 5268

Received: 16/03/2016

Respondent: Mr Michael Stanhope

Representation Summary:

This proposed development is not adjacent to any motorways and relies on long stretches of already overcrowded single lane carriageway to reach the motorway network. The development will bring more traffic and more pollution to an area already suffering with the consequences of the Magna Park distribution centre.
If approved another vast tract of our precious Leicestershire countryside will disappear under concrete.

This scheme is detrimental to the quality of life of local residents and brings no benefits to the people Harborough District Council represent.

Comment

Sustainability Appraisal - Second Interim SA Report Appraising Options for the Provision of Strategic Distribution Growth (Feb 2016)

Representation ID: 5289

Received: 16/03/2016

Respondent: Anglian Water Services Ltd

Representation Summary:

No further comment.